Forum
| BIM Fork: Are Smart Contracts in Construction More Likely to Prosper with or without BIM? | |
| Jim Mason | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (149.5 KB) |
|
| New Approach to Mediating Construction Disputes | |
| Ahmed M. Saleh | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (68.4 KB) |
|
Scholarly Papers
| Development of Prediction Models for Claim Cause Analyses in Highway Projects | |
| Dhaval Parikh, G. J. Joshi and D. A. Patel | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (395.7 KB) |
|
| Liability Exposure and Indemnity for Architecture and Engineering Professionals Acting as Independent Consultants or Design Subcontractors | |
Mayssa Kalach, Mohamed-Asem Abdul-Malak and Issam Srour |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (2.9 MB) |
|
| Lessons Learned from Progressive Design-Build Implementation on Airport Projects | |
Ghada M. Gad , Brandon Davis , Pramen P. Shrestha and Patrick Harder |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (147.7 KB) |
|
| Influence of Extrinsic Factors on Construction Arbitrators’ Decision Making | |
Smita K. Patil , K. C. Iyer and N. B. Chaphalkar |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (121.7 KB) |
|
| Strategies and Resources for Government Agencies to Utilize Disadvantaged Business Enterprises in Transportation Design-Build Projects | |
| Baabak Ashuri, Adjo Amekudzi-Kennedy, Stephanie Amoaning-Yankson, Yunping Liang and Yang Cao | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (411.5 KB) |
|
| Administration of Construction Contract Interim Payments Based on Earned-Value Reduction Techniques | |
| Farah S. Demachkieh and Mohamed-Asem U. Abdul-Malak | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (1.5 MB) |
|
| Application of Natural Language Processing and Text Mining to Identify Patterns in Construction-Defect Litigation Cases | |
Yashovardhan Jallan , Elizabeth Brogan, Baabak Ashuri and Caroline M. Clevenger |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (493 KB) |
|
| Effect of Change Orders on Cost and Schedule for Small Low-Bid Highway Contracts | |
Pramen P. Shrestha and Ruiko Maharjan |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (611.3 KB) |
|
| Comparative Analysis between Distracted Driving Texting Laws and Driver’s Behavior in Construction Work Zones | |
Didier Valdes, Carla Lopez del Puerto , Benjamin Colucci, Alberto Figueroa , Ricardo Garcia Rosario , Enid Colon Torres and Maria X. Rojas Ibarra |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (875.3 KB) |
|
| Loss of Productivity Analysis Using Project-Specific Curves | |
| Tong Zhao and J. Mark Dungan | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (443.3 KB) |
|
| Identifying Effective Project-Based Communication Indicators within Primary and Secondary Stakeholders in Construction Projects | |
| Elnaz Safapour, Sharareh Kermanshachi, Shirin Kamalirad and Dan Tran | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (761 KB) |
|
Case Studies
| Administration Impairments Resulting from Imbalanced Contract Conditions: Owner Payment Default | |
Mohamed-Asem U. Abdul-Malak , Hilmi F. Hanano and Hiba M. Turman |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (3.2 MB) |
|
| A Game-Theory Approach to Construction Dispute Resolution through Mediation | |
| Aryo Faghih and Reza Akhavian | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (358.5 KB) |
|
| Quantifying the Delay from Lost Productivity | |
Carol A. Mikhail and Engy Serag |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (760.3 KB) |
|
| Impact of Judicial Overreach on PPP Construction Projects | |
Ajit Kumar Sinha and Kumar Neeraj Jha |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 11, No. 4, November 2019 Abstract | Full Text | PDF (91.8 KB) |
and