Editor’s Note
| LADR Is Now Indexed in Scopus | |
| Amarjit Singh | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Citation | Full Text | PDF (49.5 KB) |
|
Features
| Power of Incentivization in Construction Dispute Avoidance | |
Liuying Zhu and Sai On Cheung |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (205.5 KB) |
|
| Relationship Management Strategies for Identifying Party Discord and Misperceptions | |
Lourdes Ptschelinzew , R. Edward Minchin Jr., Abdol Chini and Yuanxin Zhang |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (954.1 KB) |
|
Scholarly Papers
| Alternative Dispute Resolution Practices in International Road Construction Contracts | |
Krishna P. Kisi , Namhun Lee, Rujan Kayastha and Jacob Kovel |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (163.2 KB) |
|
| Lessons Learned in Design-Build and Construction-Manager-at-Risk Water and Wastewater Project | |
Pramen P. Shrestha and Jacimaria Batista |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (947.8 KB) |
|
| Explaining Delays in Construction Arbitration: A Process-Control Model Approach | |
Allan A. Abwunza , Titus K. Peter and Kariuki Muigua |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (201.7 KB) | Supplemental Material |
|
| Model for Preparing Optimal Contracts to Prevent or Reduce Claims in Projects | |
| Majid Parchami Jalal and Hassan Moharreri | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (521.4 KB) |
|
| Identification of Geotechnical-Related Problems Impacting Cost, Schedule, and Claims on Bridge Construction Projects | |
Pramen P. Shrestha and Krishna P. Neupane |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (422.3 KB) |
|
| Project Delivery Methods’ Change-Order Types and Magnitudes Experienced in Highway Construction | |
Douglas Alleman , Arthur L. C. Antoine, M. Scott Stanford and Keith R. Molenaar |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (218.1 KB) |
|
| Improving Concurrency Assessment and Resolving Misconceptions about But-For Delay Analysis Technique | |
Moneer Bhih and Tarek Hegazy |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (1.3 MB) |
|
| Disputes in Construction: Evaluation of Contractual Effects of ConsensusDOCS | |
Anusree Saseendran , Ben F. Bigelow, Zofia K. Rybkowski and Dawn E. Jourdan |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (117.4 KB) |
|
| Automated Requirements Identification from Construction Contract Documents Using Natural Language Processing | |
Fahad ul Hassan and Tuyen Le |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (2.4 MB) |
|
| Mock Arbitration as Experiential Legal Education for Construction Management Students | |
Erin Arneson and Mehmet E. Ozbek |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (144.2 KB) |
|
| Characteristics of Stipends and Their Value-Adding Potential in Design-Build US Highway Construction | |
Douglas Alleman , M. Scott Stanford, Dean Papajohn , Gabriel Jobidon and Keith R. Molenaar |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (757.6 KB) |
|
| Imperfect Information Bargaining Model for Determining Concession Period of PPPs under Revenue Uncertainty | |
Hongyu Jin , Shijing Liu, Jun Li and Chunlu Liu |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (568.3 KB) |
|
| Legal Perspective on Treatment of Delay Liquidated Damages and Penalty Clauses by Different Jurisdictions: Comparative Analysis | |
| Rayan Assaad and Mohamed-Asem Abdul-Malak | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (342.6 KB) |
|
| Framework Development of Performance-Based Striping Maintenance Contracts | |
| Kishor Shrestha and Pramen P. Shrestha | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (1.1 MB) |
|
| Timing of Liquidated Damages Recovery and Related Liability Issues | |
| Rayan Assaad and Mohamed-Asem Abdul-Malak | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (1.8 MB) |
|
| Qualitative Study of Sustainability Policies and Guidelines in the Built Environment | |
Cheng Siew Goh , Lynne Jack and Arun Bajracharya |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (133.4 KB) |
|
Case Studies
| Improving Economic Conditions of Project-Affected People: Case Study on Resettlement and Rehabilitation | |
Jothi Saravanan Thiyagarajan and Syed Ahmed Kabeer Khudrathullah Iqbal |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (4.2 MB) |
|
| Interactive, Online, Authentic Assessment in a British University’s Procurement and Contract Practice Module: Case Study | |
| Scott Silbereis | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (167.9 KB) |
|
Legal Notes
| Factors Influencing Power and Dependence for Collaboration among Construction Project Participants | |
Shumank Deep , Thayaparan Gajendran and Marcus Jefferies |
|
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Abstract | Full Text | PDF (1.1 MB) |
|
Conference Reviews
| LADR Hong Kong Workshop Review | |
| Sai On Cheung | |
| Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 12, No. 2, May 2020 Citation | Full Text | PDF (49.7 KB |
and