State-of-the-Art Reviews
| Understanding Sustainability in Off-Site Construction Management: State of the Art and Future Directions | |
Long Li , Haiying Luan, Xianfei Yin , Yudan Dou , Mengqi Yuan and Zhongfu Li |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (3.2 MB) |
|
| Reinforcement Learning in Construction Engineering and Management: A Review | |
Vahid Asghari, Yanyu Wang, Ava Jahan Biglari , Shu-Chien Hsu and Pingbo Tang |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (1.9 MB) |
|
Technical Papers
| Climbing the Pyramid of Megaproject Social Responsibility: Impacts of External Stakeholders and Project Complexity | |
Hanyang Ma, Kangjuan Lv, Saixing Zeng, Han Lin and Jonathan J. Shi |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (290.6 KB) |
|
| Rapid 3D Quality Control in Prefabrication Using a 3D Digital-Templates Framework | |
Mohammad Mahdi Sharif , Steven Chuo and Carl T. Haas |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (2.6 MB) |
|
| Public–Private Partnership Project Performance Analysis Compared to Design-Build in Highway Projects | |
Medya Fathi and Pramen P. Shrestha |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (786 KB) |
|
| New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects | |
Murat Çevikbaş, Ozan Okudan and Zeynep Işık |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (4.1 MB) | Supplemental Material |
|
| Influencing Factors of Early Termination for PPP Projects Based on Multicase Grounded Theory | |
| Gangzhu Sun, Jing Sun and Fengjiao Li | |
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (798.4 KB) |
|
| Critical Duration Index: Anticipating Project Delays from Deterministic Schedule Information | |
Maria-Carmen González-Cruz , Pablo Ballesteros-Pérez, Gunnar Lucko and Jing-Xiao Zhang |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (1.2 MB) | Supplemental Material |
|
| Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World | |
G. Edward Gibson Jr. , Hala Sanboskani , Mounir El Asmar and Vartenie Aramali |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (833.9 KB) |
|
| Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling | |
Fei Zuo, Enrico Zio and Yuan Yuan |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (1,015.2 KB) |
|
| Adaptive Impedance Control Method for Dynamic Contact Force Tracking of Robotic Excavators | |
Hao Feng , Qianyu Song, Chenbo Yin and Donghui Cao |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (1.9 MB) |
|
| Effect of Pressure on Construction Company Compliance Attitudes: Moderating Role of Organizational Ethical Climate | |
Junying Liu , Yiwei Wang and Zhixiu Wang |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (619.9 KB) |
|
| A System-Dynamic Model for Evaluating the Effect of Person–Team Fit on Project Performance | |
Hossein Hajarolasvadi and Vahid Shahhosseini |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (2.6 MB) |
|
| Wind-Wise Automated Stability Analysis for Selection of Tower Crane and Location | |
AlaaEldin Magdy Hebiba , Ahmed Bouferguene, Sungkon Moon and SangHyeok Han |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (3.9 MB) |
|
| Modeling Microtunnel Boring Machine Penetration Rate Using a Mechanistic Approach | |
Saeid Moharrami , Alireza Bayat and Simaan AbouRizk |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Abstract | Full Text | PDF (2.3 MB) |
|
Discussions and Closures
| Discussion of “Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis” by Su-Ling Fan, I-Cheng Yeh, and Wei-Sheng Chi | |
Nikhil M. Pawar , Shubham A. Gujar and Jayesh S. Kale |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Citation | Full Text | PDF (83.2 KB) |
|
| Closure to “Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis” by Su-Ling Fan, I-Cheng Yeh, and Wei-Sheng Chi | |
Su-Ling Fan , I-Cheng Yeh and Wei-Sheng Chi |
|
| Journal of Construction Engineering and Management, Vol. 148, No. 11, November 2022 Citation | Full Text | PDF (51.3 KB) |
,